PROJECT UPDATE
10/4/2026
The concrete frame and blockwork of the 14-storey Hodan Residential Tower are complete on every floor, and work has moved to the outside of the building.
NEWS
9/30/2026
ASAS GROUP LTD operates through seven business divisions, so a client can source an entire project from a single accountable partner.
ANNOUNCEMENT
9/26/2026
The ASAS GROUP LTD Corporate Profile 2026 can be read or downloaded from the Downloads page without registering.