Demolition and clearance of old single-storey buildings on a plot in Hamar Weyne, using a tracked excavator from the group's fleet. Completed in 2025.
The owner of a plot in Hamar Weyne needed the old single-storey buildings on it taken down before new construction could start.
ASAS GROUP LTD supplied a tracked excavator with an operator and a supervisor. The buildings were pulled down from the open side of the plot, away from the neighbouring houses and trees, and the rubble was loaded out by truck.
The plot was cleared and levelled, and handed back to the owner in February 2025.