Structural design and site supervision for a two-storey classroom block in Kismayo, completed in 2023.
ASAS GROUP LTD designed the structure of a two-storey, twelve-classroom block for a secondary school in Kismayo and supervised its construction.
Supervision was carried out on site, with the engineers checking setting-out, reinforcement and levels against the drawings before each pour, and agreeing any changes with the contractor at the drawing table.
The block was completed in November 2023 and the as-built drawings were handed to the school.
Project Details
Client
Confidential client
Scope
Structural design and site supervision
Interested in a similar project?
Submit a project inquiry and our team will respond promptly.